Elevator installation

From shaft preparation and steel work to rails, cabin, doors, and final commissioning — our installation team delivers every project with approved drawings, quality components, and inspection coordination.

25+
Years of experience
350+
Completed projects
National standard
Code-compliant execution
Elevator installation — guide rails and cabin in the shaft

Which buildings need professional elevator installation?

Atlas Asanbar Arsh installation serves residential, office, and commercial buildings — from new towers with a planned shaft to retrofit projects in older structures that need shaft, electrical, or site-access adjustments. In both cases, the goal is the same: a safe, quiet unit delivered in line with national elevator regulations.

Standard installation in Iran means mechanical and electrical work per approved supplier drawings, quality components, pre-handover safety testing, and technical inspection coordination. The gap between an experienced contractor and poor execution shows up in rail plumb, door adjustment, control wiring, and project documentation — factors that multiply repair cost and downtime after handover.

If you are still designing the building, early coordination on shaft dimensions, machine room, and floor stops reduces costly rework later. For older buildings, an initial site survey clarifies structure, power, and access so the install quote reflects reality.

Elevator design consultation

Scope of work

What does elevator installation include?

From shaft preparation to final handover — each phase delivered by an experienced crew with approved drawings.

Elevator shaft steel and guide rails

Shaft steel and rails

Shaft steel, brackets, and plumb installation of guide rails and counterweight per shop drawings.

Elevator cabin and door installation

Cabin and doors

Passenger cabin, landing doors, and car door installation with precise alignment.

Elevator motor and control panel

Motor and control panel

Wiring, drive motor (geared or gearless), and control panel with initial system tests.

Elevator commissioning and handover

Handover and inspection

Final testing, technical inspection coordination, owner training, and project documentation.

From site survey to handover: how long does installation take?

Installation duration depends on floor count, system type (geared or gearless), shaft readiness, and overlap with other trades. A new residential project with a prepared shaft often takes several weeks to a few months; retrofits or buildings with frequent stops need a tighter schedule defined in the execution plan.

After survey and contract signing, the crew follows supplier drawings on site: shaft steel and rails first, then mechanical work, doors and cabin, and finally electrical, testing, and inspection prep. The owner or site manager should provide safe shaft access, temporary power if needed, and resident coordination to avoid unnecessary delays.

After final testing, the unit is prepared for standard technical inspection and a short owner handover briefing is provided. After handover, a monthly maintenance contract defines safe ongoing operation.

Post-install maintenance contract

Our process

Installation stages from site start to handover

Technical installation guide

Site survey and execution plan

Shaft condition, site access, and floor-stop schedule are reviewed so work proceeds without unnecessary downtime.

Elevator shaft steel and guide rails

Shaft steel and preparation

Steel brackets and rail supports are built per supplier drawings; retrofit projects may need separate structural adjustments.

Elevator cabin and door installation

Rails and mechanical install

Guide rails are installed plumb and aligned; cabin, counterweight, and suspension follow in the next phase.

Elevator motor and control panel

Doors, cabin, and electrical

Landing and car doors are fitted; wiring, control panel, and motor connections are completed.

Elevator commissioning and handover

Testing, handover, and inspection

After safety tests and final adjustments, the unit is prepared for technical inspection and owner handover training.

What drives elevator installation cost?

Many owners want installation price separate from equipment — and Atlas Asanbar quotes that split clearly. Labor, mechanical and electrical execution, testing, and inspection coordination are typically in the install fee; cabin, motor, doors, and control panel are quoted as equipment line items.

Shaft steel work, structural changes in older buildings, machine-room relocation, stop count, and door type (automatic vs. semi-automatic) are major cost variables. A project with a code-ready shaft usually finishes faster and more economically; shaft retrofit or structural reinforcement is quoted separately.

For a closer estimate, include floor count and building type in your quote request. Our per-floor install cost guide and Iran elevator price guide explain market ranges — but the final figure is set after site survey and execution drawings.

Elevator installation cost per floor

Why Atlas Asanbar

Professional execution with post-handover support

Elevator installation project experience

Proven field experience

Over 25 years across residential, commercial, and healthcare buildings — our team knows site realities.

Component quality in elevator installation

Certified parts and precise engineering

From drive and panel to cabin and doors — components are sourced from trusted brands and installed per approved drawings.

Installation project coordination and support

Coordination through handover day

Progress tracking, coordination with parallel trades, and inspection readiness — for a clear handover.

Elevator installation in Tehran, Karaj, and across Iran

Atlas Asanbar Arsh head office and installation workshop are in Karaj; our crews have worked for years in Tehran, Karaj, surrounding cities, and projects across northern and central Iran. Residential, commercial, and special-case references are in our completed projects section.

For Kish, distant provinces, or sites with access constraints, we confirm feasibility after reviewing drawings and equipment logistics. Our goal is a single point of contact from cabin and motor selection through install, testing, and handover — not equipment sales without execution support.

If you need standard installation, a clear schedule, and a free quote for your building, reach us via the contact form or phone. Sales and execution teams provide a site visit and detailed quote after initial information.

Request elevator installation quote

Elevator cabins

Cabins ready for installation

Diverse designs with premium materials — choose cabin finishes before site work begins

View all

Elevator motors

Gearless and geared drives

Trusted international brands — motor matched to your building height and capacity

View all
Elevator catalog components — rails, cabin, motor, and panel

Product catalog

Cabins, motors, and components — one catalog

Choose cabin and drive from dozens of Atlas catalog models — our technical team helps you match capacity, speed, and component brands to your building.

FAQ

Common questions about elevator installation

It depends on floor count, elevator type, and shaft condition. After a site visit, we provide a realistic schedule in the quote.